Ammar, M A and Mohieldin, Y A (2002) Resource constrained project scheduling using simulation. Construction Management and Economics, 20(04), 323-30.

  • Type: Journal Article
  • Keywords: construction management; CPM; resource management; resource scheduling; simulation
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446190210131098
  • Abstract:

    Resource allocation is one of the most important issues of construction management. Two problems of resource allocation are of concern: resource levelling and resource scheduling. Traditionally, the resource scheduling problem is solved using either heuristic methods or optimization techniques. When heuristic methods are used, resource scheduling is treated as a subsequent problem for the CPM analysis. In this paper, the resource scheduling problem is handled using simulation, where logic dependence and resource availability limits are considered simultaneously during the time scheduling process. Simulation is applied to the resource scheduling problem at the project level. A simulation system called SIRBUS is used to schedule construction projects under resource constraints. Constant resource demand of activities is assumed, and the activity once started cannot be interrupted. Six example projects previously solved by different heuristic methods are re-solved using simulation. The results are compared with the latest heuristic models: current float technique and ranked positional weight method. In addition to the advantage that resource availability is considered during time scheduling as a starting point, which is an apparent feature of simulation, SIRBUS gives good results compared with existing heuristic methods.

Arditi, D, Sikangwan, P and Tokdemir, O B (2002) Scheduling system for high rise building construction. Construction Management and Economics, 20(04), 353-64.

Awakul, P and Ogunlana, S O (2002) The effect of attitudinal differences on interface conflicts in large scale construction projects: a case study. Construction Management and Economics, 20(04), 365-77.

Ford, D N, Lander, D M and Voyer, J J (2002) A real options approach to valuing strategic flexibility in uncertain construction projects. Construction Management and Economics, 20(04), 343-51.

Koraltan, S B and Dikbas, A (2002) An assessment of the applicability of partnering in the Turkish construction sector. Construction Management and Economics, 20(04), 315-21.

Shohet, I M, Puterman, M and Gilboa, E (2002) Deterioration patterns of building cladding components for maintenance management. Construction Management and Economics, 20(04), 305-14.

Tay, L and Morgan, N A (2002) Antecedents and consequences of market orientation in chartered surveying firms. Construction Management and Economics, 20(04), 331-41.